First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • traveler01@lemdro.id
    link
    fedilink
    English
    arrow-up
    2
    arrow-down
    4
    ·
    1 year ago

    And if you take into account the damage CO2 emissions are doing to the environment?

    • ephemeral_gibbon@aussie.zone
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 year ago

      Oh I think we should shut down coal as soon as possible. But if energy prices can go down by having the cheaper energy production of renewables instead of up because of nuclear the transition can happen faster.