The US Department of Energy (DOE) announces $1.5B for four transmission projects – including connecting the Texas grid to the rest of the US for the first time ever.

The projects, spanning multiple states, will add nearly 1,000 miles of new transmission lines and increase grid capacity by 7,100 megawatts (MW). They’ll boost grid reliability, lower energy costs, and support the clean energy transition.

  • cm0002@lemmy.world
    link
    fedilink
    arrow-up
    15
    ·
    26 days ago

    I mean, it still could, there’s absolutely no way they’re (not for “just” 1.5b anyways) getting online with the rest of the grid in ~30 days

    • TransplantedSconie@lemm.ee
      link
      fedilink
      arrow-up
      8
      ·
      26 days ago

      But they SAY they are. Then people vote for them again, they move the football out of the way, grandma freezes to death, and Charlie Brown falls on his ass.